Lake Archer Septic
New Presby style septic system on Lake Archer with associated retaining walls. Scope included installation of septic tank and pump chamber, Presby style septic field, 2 tiered gravity block retaining wall, loam and hydroseed. Challenges included a steep grade change of 30+ feet from elevation of state roadway to elevation of septic tank location & limited access through one piece of guard rail per the MassDOT. Project was started by another contractor who failed to return after mobilizing on the site and removing the existing septic tank.
Morins Diner
Renovation of Morins restaurant and diner. Scope included upgrades to water and sewer utilities, installation of new 2500 gallon grease trap, cut and cap of old water utilities, excavation for bar addition, paving of parking lot, pavement markings and regulatory signage. Work challenges included a tight working area with limited space.
Oake Knoll Farm
New cowbarn and store at Oake Knoll Farms. Scope includes the demolition of existing structures, import of 12,000 yards of structural fill, utility installation, foundation excavation & site grading.
Oasis at Plymouth
320 unit apartment complex in Plymouth Mass. Work was done as a partnership with another site contractor to get the job done within schedule. Scope included mass cuts to fills, utility installation, water booster station, site grading, excavation work for 6 apartment buildings, club house, cabana, and multiple garages, paving, curbing, pavement markings and regulatory signage. Work also included the reconstruction of a nearby intersection to allow for the higher traffic impacts.
Projects: Master Meters
Projects: Retaining Walls
We offer design, permitting and installation of gravity block retaining walls. Various options of blocks available.